End-to-end flow
JT122674 · Haukeland universitetssjukehus
One inquiry, all stages. Each box below is the actual artifact persisted by the pipeline — not a mockup. The brief asks: "does Kine actually work?". This page is the answer.
9 stages
- From: sveinung.knutsen@helse-bergen.noSubject: 2 1/2" Bailey damp reduksjon+rep settBody: 410 charsAttachments: Outlook-laforrfz.png, image261431.gif
Show full email body
Hei og godt nytt år Har dere mulighet å gi oss et tilbud på en 2 1/2" Bailey damp reduksjons ventil og rep.sett med pakninger. Reduksjonen vi trenger er fra 10bar til 3bar. Venleg helsing Sveinung Knutsen Driftsleder Maskinseksjonen 55974702/93427883 Haukeland universitetssjukehus sveinung.knutsen@helse-bergen.no<mailto:roald.fosse@helse-bergen.no> [cid:7932859f-53c2-498f-94fb-8efb9897b452]
Show extracted JSON
{ "language": "no", "intent": "new_inquiry", "customer": { "company": "Haukeland universitetssjukehus", "contact_name": "Sveinung Knutsen", "contact_email": "sveinung.knutsen@helse-bergen.no", "phone": "55974702/93427883", "vat_number": null, "address": null }, "items": [ { "line_no": 1, "quantity": 1, "unit": "stk", "product_reference": "2 1/2\" Bailey damp reduksjon ventil (steam reduction valve)", "manufacturer": "Bailey", "manufacturer_part_no": null, "cross_ref_to": null, "specs": { "dimension": "2 1/2\"", "pressure_rating": "10bar til 3bar", "material_body": null, "material_seal": null, "actuation": null, "voltage": null, "torque_or_flow": null, "temperature": "steam", "thread_or_connection": null, "other": [ { "key": "type", "value": "damp reduksjon (steam reduction)" } ] }, "missing_fields": [ "manufacturer_part_no", "material_body", "material_seal", "thread_or_connection" ] }, { "line_no": 2, "quantity": 1, "unit": "sett", "product_reference": "rep.sett med pakninger til Bailey 2 1/2\" damp reduksjon ventil (repair set with seals)", "manufacturer": "Bailey", "manufacturer_part_no": null, "cross_ref_to": null, "specs": { "dimension": null, "pressure_rating": null, "material_body": null, "material_seal": null, "actuation": null, "voltage": null, "torque_or_flow": null, "temperature": null, "thread_or_connection": null, "other": [] }, "missing_fields": [ "manufacturer_part_no", "material_seal", "pressure_rating" ] } ], "application_context": "Steam pressure reduction system at Haukeland University Hospital, reducing from 10bar to 3bar", "attachments_referenced": [], "delivery": { "location": null, "deadline": null, "incoterms": null }, "previous_reference": { "is_update_of": null, "notes": null }, "completeness": "partial", "missing": [ "manufacturer_part_no (Bailey valve model/reference)", "material_body", "material_seal", "thread_or_connection", "delivery_location" ] }- 3ok
Completeness verdict: partial
Step 03Missing: manufacturer_part_no (Bailey valve model/reference), material_body, material_seal, thread_or_connection, delivery_location
partial- manufacturer_part_no (Bailey valve model/reference)
- material_body
- material_seal
- thread_or_connection
- delivery_location
Rule trace (deterministic)Verdict: partial · 1 of 2 items need clarification- item 1: ✓ quotable — quotable (sizing + 2 disambiguating specs)
- item 2: × needs follow-up — no sizing field (need dimension or torque/flow)
- Subject: RE: Tilbud Bailey damp reduksjon ventil
Hei Sveinung, Takk for din henvendelse om 2 1/2" Bailey damp reduksjon ventil og rep.sett med pakninger. Vi er klare til å hjelpe med dette. For at vi kan gi dere et presist tilbud trenger vi noen flere opplysninger: • Spesifikk Bailey-modell eller referansenummer • Material for ventilkropp og tetninger • Thread- eller tilkoblingstype • Trykkklasse for rep.settet • Leveringsadresse Når disse opplysningene kommer, sender vi tilbud raskt. Med vennlig hilsen, J.S.Cock A/S sales team
Drafted by haiku · awaiting human approval. - 5ok
Customer created in Business Central
Steps 08 + 09New BC# C-20024 — Haukeland universitetssjukehus
BC#: C-20024Company: Haukeland universitetssjukehusEmail: sveinung.knutsen@helse-bergen.no - 6ok
Match items against the J.S.Cock catalog
Steps 12 + 13Top-5 candidates per item via TF-IDF over 18.8k SKUs (see Matches tab on /inquiry/JT122674).
- 7skip
Score supplier quotes
Steps 16 + 17No supplier replies received yet — scoring waits for at least one.
- 8skip
Draft quote in Business Central
Steps 10 + 20Waiting for the supplier quote to land before drafting.
- 9pending
Human approval (sales engineer)
Step 21In production this becomes a real review UI in Week 2-3. Demo: approve / edit / reject from the page.
Process map: see how this aligns with JS Cock’s diagram →