End-to-end flow
JT122961
One inquiry, all stages. Each box below is the actual artifact persisted by the pipeline — not a mockup. The brief asks: "does Kine actually work?". This page is the answer.
4 stages
- From: Rene SortvikSubject: New inquiryBody: 238 charsAttachments: image002.png, image003.gif, image053672.gif
Show full email body
Hello Please offer following pumps. This is Cast iron, offer alternative inn better material. AL11022400 AL-1102/2-128 4,0kW 3x400/690V/50Hz AL11024220-181 AL-1102/4-181 2,2kW 3x230/400V/50Hz
Show extracted JSON
{ "language": "en", "intent": "cross_reference", "customer": { "company": null, "contact_name": null, "contact_email": null, "phone": null, "vat_number": null, "address": null }, "items": [ { "line_no": 1, "quantity": null, "unit": null, "product_reference": "AL-1102/2-128 pump, 4.0 kW, 3x400/690V/50Hz; cast iron — customer asks for alternative in better material", "manufacturer": null, "manufacturer_part_no": "AL11022400", "cross_ref_to": "AL-1102/2-128", "specs": { "dimension": null, "pressure_rating": null, "material_body": "cast iron (current); customer wants alternative", "material_seal": null, "actuation": "electric", "voltage": "3x400/690V/50Hz", "torque_or_flow": "4.0 kW", "temperature": null, "thread_or_connection": null, "other": [] }, "missing_fields": [ "quantity", "preferred alternative material" ] }, { "line_no": 2, "quantity": null, "unit": null, "product_reference": "AL-1102/4-181 pump, 2.2 kW, 3x230/400V/50Hz; cast iron — customer asks for alternative in better material", "manufacturer": null, "manufacturer_part_no": "AL11024220-181", "cross_ref_to": "AL-1102/4-181", "specs": { "dimension": null, "pressure_rating": null, "material_body": "cast iron (current); customer wants alternative", "material_seal": null, "actuation": "electric", "voltage": "3x230/400V/50Hz", "torque_or_flow": "2.2 kW", "temperature": null, "thread_or_connection": null, "other": [] }, "missing_fields": [ "quantity", "preferred alternative material" ] } ], "application_context": "Customer requests pumps that are currently supplied in cast iron and wants an alternative in better material — material upgrade without changing electrical/power spec.", "attachments_referenced": [], "delivery": { "location": null, "deadline": null, "incoterms": null }, "previous_reference": { "is_update_of": null, "notes": null }, "completeness": "unusable", "missing": [ "customer identity (company, contact name, email)", "quantity per item", "delivery location", "deadline", "target alternative material" ] }- 3ok
Completeness verdict: unusable
Step 03Missing: customer identity (company, contact name, email), quantity per item, delivery location, deadline, target alternative material
unusable- customer identity (company, contact name, email)
- quantity per item
- delivery location
- deadline
- target alternative material
Rule trace (deterministic)Verdict: unusable · no customer identity (need company name or contact email)- item 1: × needs follow-up — no quantity
- item 2: × needs follow-up — no quantity
Process map: see how this aligns with JS Cock’s diagram →