J.S.Cock · AI Inquiry Demo
← All inquiries · Inquiry detail view
End-to-end flow

JT123181 · Normatic AS

One inquiry, all stages. Each box below is the actual artifact persisted by the pipeline — not a mockup. The brief asks: "does Kine actually work?". This page is the answer.

9 stages
  1. 1

    Email arrives in M-Files inbox

    Step 01

    Inquiry stored at .tmp/jscock_mfiles/JT123181/inquiry.eml

    ok
    From: el@normatic.no
    Subject: Vedr oksygenventiler HI Matre
    Body: 2307 chars
    Attachments: image001.png, image181947.gif
    Show full email body
  2. 2

    AI extracts structured JSON

    Step 02

    1 item(s) detected · language=no · intent=new_inquiry

    ok
    Norwegiannew inquiry1 item(s)
    Show extracted JSON
    {
      "language": "no",
      "intent": "new_inquiry",
      "customer": {
        "company": "Normatic AS",
        "contact_name": "Einar Løken",
        "contact_email": "el@normatic.no",
        "phone": "+47 951 90 856",
        "vat_number": null,
        "address": "Nordfjordeid"
      },
      "items": [
        {
          "line_no": 1,
          "quantity": 1,
          "unit": "stk",
          "product_reference": "Membranventil med elektrisk aktuator 24VDC, tilsvarende 690/15/D-771141-1436-4222 fra 2006",
          "manufacturer": null,
          "manufacturer_part_no": "690/15/D-771141-1436-4222",
          "cross_ref_to": "Gemu",
          "specs": {
            "dimension": "ø16",
            "pressure_rating": "PN10",
            "material_body": "plast",
            "material_seal": null,
            "actuation": "electric",
            "voltage": "24VDC",
            "torque_or_flow": "0-10 l/min",
            "temperature": null,
            "thread_or_connection": null,
            "other": [
              {
                "key": "digital_position_reference",
                "value": "1436000Z1SA0101030"
              },
              {
                "key": "original_flow_2006",
                "value": "6 l/min"
              }
            ]
          },
          "missing_fields": [
            "manufacturer",
            "material_seal",
            "temperature",
            "thread_or_connection"
          ]
        }
      ],
      "application_context": "Regulering av oksygenert ferskvann/sjøvann til fiskekar (oxygen regulation to fish tanks). Plastic diaphragm valves installed in 2006 achieved better setpoint stability than other solutions tested. Customer seeks replacement for testing.",
      "attachments_referenced": [
        "image001.png"
      ],
      "delivery": {
        "location": null,
        "deadline": null,
        "incoterms": null
      },
      "previous_reference": {
        "is_update_of": "2006 membrane valve order 690/15/D-771141-1436-4222",
        "notes": "Customer seeking equivalent product with electric 24VDC actuator (original was manual). Requesting cost comparison with Gemu alternative."
      },
      "completeness": "partial",
      "missing": [
        "Exact current manufacturer and model",
        "Operating temperature range",
        "Material specification for seal",
        "Connection type (thread size/type or flange)",
        "Delivery location and deadline"
      ]
    }
  3. 3

    Completeness verdict: partial

    Step 03

    Missing: Exact current manufacturer and model, Operating temperature range, Material specification for seal, Connection type (thread size/type or flange), Delivery location and deadline

    ok
    partial
    • Exact current manufacturer and model
    • Operating temperature range
    • Material specification for seal
    • Connection type (thread size/type or flange)
    • Delivery location and deadline
    Rule trace (deterministic)
    Verdict: complete · all items quotable directly
    • item 1: ✓ quotablemanufacturer part-no or cross-ref present (catalog-resolvable)
  4. 4

    AI drafts follow-up email to customer

    Step 04

    Drafted in no, awaiting human approval.

    ok
  5. 5

    Customer created in Business Central

    Steps 08 + 09

    New BC# C-20038 — Normatic AS

    ok
    BC#: C-20038
    Company: Normatic AS
    Email: el@normatic.no
  6. 6

    Match items against the J.S.Cock catalog

    Steps 12 + 13

    Top-5 candidates per item via TF-IDF over 18.8k SKUs (see Matches tab on /inquiry/JT123181).

    ok
  7. 7

    Score supplier quotes

    Steps 16 + 17

    No supplier replies received yet — scoring waits for at least one.

    skip
  8. 8

    Draft quote in Business Central

    Steps 10 + 20

    Waiting for the supplier quote to land before drafting.

    skip
  9. 9

    Human approval (sales engineer)

    Step 21

    In production this becomes a real review UI in Week 2-3. Demo: approve / edit / reject from the page.

    pending

Process map: see how this aligns with JS Cock’s diagram →